July 3, 2015
Marina Falls
3yd July
2017

The workshop centred on a hypothetical scenario, refugees are trying to escape a dangerous war, and they look to the sea to provide their escape. The assignment challenged students to create an easy-to-assemble floating structure, with as found materials, that could be dropped by a UN helicopter to support fleeing refugees.The workshop consisted of two phases. The first phase was research and design - allowing the attendees to explore the materials provided by the brief, and the second phase was fabrication of the structure as well as testing the 1/1 model at Kato Pyrgos beach.
– Andri Orthodoxou
Share this page:
#cyprus #fridayforum


